1.6-m Perkin Elmer Telescope
2005, August 1/2: Overview
648
CCD frames have been obtained
in this night. All of these were
observed in frame-transfer mode with the
routine CCDRAP. It is not possible to
list details of observations obtained
in this mode.
These data become/became public on:
2007 August 1
|